Sign In | Join Free | My uabig.com |
|
Brand Name : VIBRA
Model Number : FV-250
Certification : ISO 9001:2015
Place of Origin : Shanghai, China
MOQ : 1 set
Price : Negotiation
Payment Terms : L/C, T/T, D/P, Western Union, MoneyGram
Supply Ability : 20 Set/Month
Delivery Time : 7-35 days
Packaging Details : 5.05 CBM
Name : Excavator Mounted Pile Driver::Piling and Pulling
Feature : Low noise Fast Operation
Operation Pressure : 32Mpa
Hammer Weight : 1700kg
Arm Weight : 500kg
Max.Pile Length : 10m
Centrifugal Force : 265kn
Vibration Frequency : 2800rpm
Material : Steel, Core materials are all imported
Color : Blue/Yellow/Red/White, customized color available
HS Code : 8430100000
Type : Hydraulic Vibrating Hammer
Vibro hammer for 10 meter sheet pile driving construction projects
Larsen steel sheet pile retaining always the first choose! Whether construction, irrigation, sewage treatment, and now floods, strong Larsen steel sheet pile can be perseverance does not fall in the water! And do Larsen steel sheet pile cofferdam is environmentally friendly construction speed, low construction costs, time-sensitive!
Features
Working Principle
Hydraulic vibrating pile driver take the advantage of high frequency vibration generated by motor and transit the vibration force to the hydraulic vibrating pile driver for the surrounding soil liquefying & break its structure to reduce the friction; then piling or drilling the pile form the soil ground via excavator. The high frequency vibration is driven by the hydraulic motor of the excavator.
The hydraulic motor drives the two eccentric axes to rotate at high speed in opposite direction. The horizontal force of the eccentric axis cancels each other without vibration. The vertical forces add up to each other, creating a vertical-frequency vibration.
Machinery Characteristics
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ?
A: One set is available.
Q: What's the payment method?
A: We accept L/C, T/T and D/P payment.
Q: What is the delivery time?
A: The delivery time is generally 1-8 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine?
A: Of course you can.
Q: How is your product quality?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!
![]() |
Hydraulic Vibro Hammer For 10 Meter Sheet Pile Driving Construction Projects Images |