Sign In | Join Free | My uabig.com
China Shanghai Yekun Construction Machinery Co., Ltd. logo
Shanghai Yekun Construction Machinery Co., Ltd.
Shanghai Yekun Construction Machinery Co., Ltd.
Verified Supplier

6 Years

Home > Excavator Mounted Pile Driver >

Coastal Areas Project Work Excavator Mounted Pile Driver 18M Length

Shanghai Yekun Construction Machinery Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Coastal Areas Project Work Excavator Mounted Pile Driver 18M Length

Brand Name : VIBRA

Model Number : FV-350L

Place of Origin : SHANGHAI

MOQ : 1 set

Price : Negotiation

Payment Terms : L/C, T/T, D/P

Supply Ability : 15 set/month

Delivery Time : 7-35 days

Packaging Details : 7.616 CBM

Name : Excavator Mounted Pile Driver

Feature : High Precision

Vibration Frequency : 3200rpm

Operation Pressure : 32Mpa

Hammer Weight : 2400kg

Arm Weight : 670kg

Centrifugal Force : 435Kn

Excavator : 35~40 ton

Piling Length : !5m

HS Code : 8430100000

Color : Blue/Yellow, customized color available

Material : Steel, Core materials are all imported

Type : New and Used both available

Inner Parts : Imported from American and European Countries

Contact Now

Application

  • Pile driving steel sheet pile, cement pile, steel rail pile, iron plate, H steel
  • Quick converting operation; Applied to various working environments.
  • Compared to other systems, less force required for pile pulling
  • Not damage the top or bottom of steel pipe pile, steel plate pile and steel rail pile.
  • Not damage the building even often work near it.
  • Adopted Rubber sheath to reduce noise and vibration, the operation is quiet and the working period is short; It is helpful to overcome environmental problems.
  • According to the placement direction of sheet pile and site conditions, the sheet pile can be clamped or lowered by positive and negative rotation of 180 °. The vibration frequency can be adjusted by two levels, and the two-level double pumps are combined to greatly increase the excitation force.

Coastal Areas Project Work Excavator Mounted Pile Driver 18M Length

Features

VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal, bridges, cofferdam, building foundation, etc.

With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles,etc.

Coastal Areas Project Work Excavator Mounted Pile Driver 18M Length

Technical Parameter

Item FV-250 FV-280 FV-300 FV-330 FV-350L FV-350 FV-400
Vibration Frequency (rpm) 2500 2800 3200 3200 3200 3200 3200
Operation Pressure (Mpa) 30 32 32 32 32 32 32
Centrifugal Force (KN) 265 335 350 372 435 455 485
Max.Pile Length (m) 10 12 12 12 15 15 18
Arm Weight (kg) 500 500 670 670 670 750 750
Hammer Weight (kg) 1700 1900 2100 2300 2400 2600 2700
Excavator (T) 20-30 20-30 30-35 33-40 35-40 40-45 45-60

About Us

Shanghai Ye Kun Construction Machinery Co., Ltd. is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.

After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.

Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.

Coastal Areas Project Work Excavator Mounted Pile Driver 18M Length

FAQ

Q: How long is the warranty period ?

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

Q: What is the MOQ ?

A: 1 set is available.

Q: What's the payment method ?

A: We accept T/T and D/P payment.

Q: What is the delivery time ?

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

Q: Can I have our LOGO on the machine ?

A: Of course you can.

Q: How is your product quality ?

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

Q: Can I be your dealer ?

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!


Product Tags:

18M excavator sheet pile driver

      

18M excavator static pile driver

      

Coastal excavator static pile hammer

      
Wholesale Coastal Areas Project Work Excavator Mounted Pile Driver 18M Length from china suppliers

Coastal Areas Project Work Excavator Mounted Pile Driver 18M Length Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shanghai Yekun Construction Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)